Crestview Middle School Case Study

THE PROJECT

Retro-Commissioning (RCx) Study and Implementation

LOCATION: Rockwood School District
COMPLETED: March 2019
BEFORE
INITIAL ENERGY USAGE
AFTER
THE RESULTS
COST TO DISTRICT
MEASURES
ACCUMULATED SAVINGS OVER ONE YEAR

WHAT MADE THIS PROJECT UNIQUE?

The building’s parameters had become skewed over years of
adjustments. Automatic Controls identified the supply fan on the rooftop units’ were being overworked and rebalanced the school’s 91 VAV boxes- allowing the supply fan on the rooftop units to slow down, saving energy.

WHAT DOES THE DISTRICT SAY

“This is the third retro-commissioning project that Automatic Controls has performed for us. The program has produced great results and the plan is to continue RCx at other schools. Energy savings are achieved while still maintaining a comfortable environment for staff and students.

Ready to take control of your energy management and unlock the potential for savings and efficiency?

Connect with an Automatic Controls representative today to take the first step.